1990
DOI: 10.1016/0166-218x(90)90105-l
|View full text |Cite
|
Sign up to set email alerts
|

A survey of results for sequencing problems with controllable processing times

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
71
0

Year Published

1998
1998
2017
2017

Publication Types

Select...
8
2

Relationship

0
10

Authors

Journals

citations
Cited by 182 publications
(71 citation statements)
references
References 15 publications
0
71
0
Order By: Relevance
“…Scheduling problems with controllable processing times have gained importance in scheduling research since the pioneering works of Vickson [23,24]. For a survey of this area until 1990, the reader is referred to [17]. Recent results include [2,3,4,10,14,15,20,22,26].…”
Section: Introductionmentioning
confidence: 99%
“…Scheduling problems with controllable processing times have gained importance in scheduling research since the pioneering works of Vickson [23,24]. For a survey of this area until 1990, the reader is referred to [17]. Recent results include [2,3,4,10,14,15,20,22,26].…”
Section: Introductionmentioning
confidence: 99%
“…4, pp. 724-736, © 2017 been actively studied since the 1980s; see the surveys by Nowicki and Zdrzałka (1990), Shabtay and Steiner (2007). To demonstrate the link between the problems with controllable processing times and the SSP, we give a description of the former model for a machine environment similar to that of SSP.…”
Section: Introductionmentioning
confidence: 99%
“…The quality of the resulting schedule is measured with respect to the cost of assigning the actual processing times that guarantee a certain scheduling performance. This area of scheduling has been active since the 1980s, see surveys [21] and [27].…”
Section: Introductionmentioning
confidence: 99%