A Study on the Configuration of Low‐Voltage Distribution Networks for High Penetration of Photovoltaic Power Sources

Abstract: In recent years, massive introduction of photovoltaic power sources (PV) has compounded the problem of voltage fluctuation in distribution networks. The problem has been recognized from early on, and many research studies have been already reported. However, majority of the previous studies focused on high‐voltage distribution networks. Hence, in this study, the authors investigated appropriate configurations for low‐voltage distribution networks in Japan to address the problem as a planning problem. The on‐si… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
2
2

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(8 citation statements)
references
References 11 publications
(10 reference statements)
0
7
0
Order By: Relevance
“…The standard equipment measures that can be implemented in a low-voltage network to resolve issues that may occur when PVs are connected to the network (voltage, current, or transformer capacity) are listed below in order of priority [11,12]. This study focused on measures (A), (D), (F), and (G) and excluded measures (B), (C), and (E).…”
Section: Equipment-related Measuresmentioning
confidence: 99%
See 4 more Smart Citations
“…The standard equipment measures that can be implemented in a low-voltage network to resolve issues that may occur when PVs are connected to the network (voltage, current, or transformer capacity) are listed below in order of priority [11,12]. This study focused on measures (A), (D), (F), and (G) and excluded measures (B), (C), and (E).…”
Section: Equipment-related Measuresmentioning
confidence: 99%
“…1. An image of a 'Section' [12] the applicable equipment and other details regarding these measures, we can summarize these items into the two following problems 1 and 2: Both problems were simultaneously considered as the 'lowvoltage system configuration determination problem'.…”
Section: Equipment-related Measuresmentioning
confidence: 99%
See 3 more Smart Citations