A Study on Project Planning Using the Deterministic and Probabilistic Models by Network Scheduling Techniques

Abstract: ABSTRACT:Project planning is the important task in many areas like construction, resource allocation and many. A sequence of activities has to be performed to complete one task. Each activity has its unique processing time and all together to identify the critical activities which affect the completion of the project. In this paper the probabilistic and deterministic models to determine the project completion time and also the critical activities are considered. A case study on building construction project ha… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 5 publications
0
2
0
Order By: Relevance
“…The picture of a typical house type 36 is shown in Figure 1. The Critical Path Method (CPM) is a deterministic scheduling method commonly used in construction project scheduling (Rama et al, 2017). The advantage of CPM in project scheduling is that the calculation process to determine the completion time of a project is relatively easy (González-Cruz et al, 2022).…”
Section: Datamentioning
confidence: 99%
“…The picture of a typical house type 36 is shown in Figure 1. The Critical Path Method (CPM) is a deterministic scheduling method commonly used in construction project scheduling (Rama et al, 2017). The advantage of CPM in project scheduling is that the calculation process to determine the completion time of a project is relatively easy (González-Cruz et al, 2022).…”
Section: Datamentioning
confidence: 99%
“…Rama et al [40] proposed a study on project planning using the deterministic and probabilistic models by network scheduling techniques. Using a building construction project as a case study and applying the two project scheduling methods namely PERT and CPM to determine numerically the different types of floating times of each activity and hence determined the central path which plays an important role in the project completion time.…”
Section: Determine the Critical Pathmentioning
confidence: 99%