In this paper Hybrid air turbines One way to set up, Battery energy saving With systems (BESS)Is to increase the turbines. In such windmills Caused by the speed of the wind By contrast, the price of BESS Increases and battery Life expectancy decreases. BESS Fitted hybrid Operation of the wind mill to reduce costs Awareness management this paper proposes the technique. In the calculation of wind speed considering the error in Battery charging and Discharge forces are diagnosed. This investigation is a windmill three different for the farm considering the conditions. Battery operating cost and Life cycle number Temperature to estimate and of exhaust changes when calculating the depth aging for lead-acid battery the model used. Overhead lines Large coastline using To connect the windmills, HVDC Became flexible control And advanced computer Stability and up to 600 km For sending over Significant at low cost Provides benefits .Will use IGBT Voltage Source Converter (VSC) Based HVDC system Wind turbines Optional DC to connect Technically widespread Accepted, because In its independent active And reactive power control, Flexible AC system Control and support For marine wind farms Important. The purpose of this study of fuzzy TOPSIS systems General of development is to provide perspective. We have a literary review starting and making decisions Used in the field various obscure patterns Lets explore. Finally, some of the obscure topsides Applications We provide. Supply chain, Environment, energy sources, Such as trade and health in the application areas Distributed and Classified. Obscure other associated with TOPSIS Methods, Vague TOPSIS Processes, ambiguous Packages, hesitant vague Packages or intuition Obscure packages, Ambiguous analysis step Process (AHP) or Team decision-making improvements by such attitudes are explored and compared. Many alternatives and Criteria are used. Finally, current trends, the most popular approaches and insight into directions. we are taking this End user view, Frequency of running, Ease of fixing Errors, Time of fault detection are alternatives. Evaluation, Incremental Integration, Top Down integration testing, sandwich, Big bang, End to End testing Frequency of running parameter. Alternative: Incremental Integration, Top Down integration testing, sandwich, Big bang, End to End testing. Evaluation Preference: End user view, Frequency of running the tests, Ease of fixing Errors, Time of fault detection. In this form of analysis, the TOPSIS method is the most ideal Short-distance solution and negative-best The solution with the longest distance from the solution Determines, but the comparison of these distances Does not consider importance. From the result it is seen that End to End testing is got the first rank whereas is the sandwich is having the lowest ran