A Study on Initial Value Setting Method for Relaxation Tests in High Strength Bolted Joints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 8 publications
0
1
0
Order By: Relevance
“…The two bolts at the fix side were tightened using the torque method by shear wrench until the bolt tip sheared, and before the slippage test increased the design bolt axial force by 20% (205 kN×1.2=246 kN) using the torque method. The initially introduced bolt axial force was measured 3 seconds after the peak of tightening [14] and the axial force was measured at 1 second interval until 1 hour after tightening, at intervals of 1 minute until 24 hours after tightening, and at intervals of 15 minutes thereafter.…”
Section: Bolt Axial Forcementioning
confidence: 99%
“…The two bolts at the fix side were tightened using the torque method by shear wrench until the bolt tip sheared, and before the slippage test increased the design bolt axial force by 20% (205 kN×1.2=246 kN) using the torque method. The initially introduced bolt axial force was measured 3 seconds after the peak of tightening [14] and the axial force was measured at 1 second interval until 1 hour after tightening, at intervals of 1 minute until 24 hours after tightening, and at intervals of 15 minutes thereafter.…”
Section: Bolt Axial Forcementioning
confidence: 99%