2011
DOI: 10.3130/aijt.17.443
|View full text |Cite
|
Sign up to set email alerts
|

A Study on Accuracy of Piling Work for Using Joint of Pile Head and Steel Tube Column

Abstract: Akifumi TAKEDA-ーーーー * 1Haruyuki YAMAMOTO-ーー * 2 This paper presents the results of pile construction work for two steelframe buildings. These buildings incorporate a method proposed by the authors in which the bottom end of a steel column is directly connected to the top end of a precast concrete pile. This method, which was developed for the construction of low-rise, long-span, steel-frame buildings, obviates the need for pile caps and underground beams. This method, however, requires greater accuracy in p… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?