Abstract:Since 1997, the Critical Chain Project Management (CCPM) method has received considerable attention. Hundreds of successful CCPM cases have achieved highly reliable on-time delivery (OTD) with short project lead-time (PLT) in multi-project environments. However, two obstacles have remained, blocking the implementation of CCPM to project management (PM) society. The first has been addressed by PM practitioners, who have been less than confident that OTD and PLT can be significantly improved by simply changing t… Show more
“…TOC is proposed by Dr. Goldratt in 1986 (Umble et al, 2006;Wu et al, 2013;Huang et al, 2014). Dr. Goldratt believes that there are bottlenecks in every system and bottlenecks limit the output of the entire system.…”
Recently, many enterprises have implemented the Toyota production system (TPS) in order to improve their production performance and competitiveness. However, some of those enterprises which implemented TPS couldn't improve performance, even led to
“…TOC is proposed by Dr. Goldratt in 1986 (Umble et al, 2006;Wu et al, 2013;Huang et al, 2014). Dr. Goldratt believes that there are bottlenecks in every system and bottlenecks limit the output of the entire system.…”
Recently, many enterprises have implemented the Toyota production system (TPS) in order to improve their production performance and competitiveness. However, some of those enterprises which implemented TPS couldn't improve performance, even led to
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.