2014
DOI: 10.6007/ijarafms/v4-i1/505
|View full text |Cite
|
Sign up to set email alerts
|

A Study of Using Simulation to Overcome Obstacles That Block the Implementation of Critical Chain Project Management to Project Management Environment

Abstract: Since 1997, the Critical Chain Project Management (CCPM) method has received considerable attention. Hundreds of successful CCPM cases have achieved highly reliable on-time delivery (OTD) with short project lead-time (PLT) in multi-project environments. However, two obstacles have remained, blocking the implementation of CCPM to project management (PM) society. The first has been addressed by PM practitioners, who have been less than confident that OTD and PLT can be significantly improved by simply changing t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2015
2015
2015
2015

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 21 publications
(21 reference statements)
0
1
0
Order By: Relevance
“…TOC is proposed by Dr. Goldratt in 1986 (Umble et al, 2006;Wu et al, 2013;Huang et al, 2014). Dr. Goldratt believes that there are bottlenecks in every system and bottlenecks limit the output of the entire system.…”
Section: Theory Of Constraints (Toc)mentioning
confidence: 99%
“…TOC is proposed by Dr. Goldratt in 1986 (Umble et al, 2006;Wu et al, 2013;Huang et al, 2014). Dr. Goldratt believes that there are bottlenecks in every system and bottlenecks limit the output of the entire system.…”
Section: Theory Of Constraints (Toc)mentioning
confidence: 99%