A Smarter Grid Operation: New Energy Management Systems in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(9 citation statements)
references
References 2 publications
0
8
0
Order By: Relevance
“…P L , P G Total capacity of system load/ generation. R 1 Ratio of the static load to the total load.…”
Section: K Regmentioning
confidence: 99%
See 1 more Smart Citation
“…P L , P G Total capacity of system load/ generation. R 1 Ratio of the static load to the total load.…”
Section: K Regmentioning
confidence: 99%
“…Sichuan and Yunnan provinces), and over 70% of the energy is consumed by East China and Central China where primary energy resources are scared. The UHVAC/UHVDC hybrid power grids are established by the SGCC in these provinces to transmit large-scale electricity eastward [1], [2]. To ensure the safety of energy supply and emission reduction [3], the Chongqing-Hubei back-to-back flexible HVDC interconnection project has been put into operation on June 24, 2019, thus SCG becomes asynchronously interconnected to the Central China-North China AC interconnection system.…”
Section: Introductionmentioning
confidence: 99%
“…With the construction of a power supply company's power dispatching data network, the main station has been consecutively connected to all county dispatching services, resulting in further convergence and an increase in information flow in the main station, which puts considerable pressure on the dispatching data network and the main station dispatching automation system [19,20]. Due to access to county transfer automation business, the operation analysis report of power dispatch automation shows that many hidden defects are generated in the information flow, which is very difficult to trace and analyze due to the large amount of data and fast disappearance of information flow [21,22]. The dispatching automation system sometimes encounters the problem of misreporting or omitting information due to misdirected data from communication channels or plant and station general control equipment [23][24][25].…”
Section: Introductionmentioning
confidence: 99%
“…The output of renewable energy power generation (such as wind power and photovoltaic) has natural randomness and volatility. Ensuring the utilization of new energy in the power system is a key problem in the operation of China's power system [4][5]. It is an important means for the power industry of China to ensure the stable utilization of renewable energy in the power system by constructing sufficient transmission channels, configuring energy storage, improving the flexibility of power users, and using digital analysis and application of power business [6][7].…”
Section: Introductionmentioning
confidence: 99%