A Simulation Based Study on Increasing Production Capacity in a Crankshaft Line Considering Limited Budget and Space

Abstract: In this paper, we discussed a problem for improving the throughput of a crankshaft manufacturing line in an automotive factory in which the budget for purchasing new machines and installing additional buffers is limited. We also considered the constraint of available space for both of machine and buffer. Although this problem seems like a kind of buffer allocation problem, it is different from buffer allocation problem because additional machines are also considered. Thus, it is not easy to calculate the throu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0
3

Year Published

2017
2017
2024
2024

Publication Types

Select...
3
1
1

Relationship

1
4

Authors

Journals

citations
Cited by 7 publications
(11 citation statements)
references
References 13 publications
0
8
0
3
Order By: Relevance
“…2. We used a same example in Wang et al [12]. The factory has a plan to increase the production capacity with the smallest budget to meet the increasing demand, and thus, it is necessary to find the bottleneck for growing up throughput.…”
Section: Heuristic Solution Algorithmmentioning
confidence: 99%
See 3 more Smart Citations
“…2. We used a same example in Wang et al [12]. The factory has a plan to increase the production capacity with the smallest budget to meet the increasing demand, and thus, it is necessary to find the bottleneck for growing up throughput.…”
Section: Heuristic Solution Algorithmmentioning
confidence: 99%
“…We also considered the failures of machines. Tool change times and defect rates (see Wang et al [12] for detail data). B1 20 10 B2 17 13 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 2 17 20 23 15 17 17 20 34 20 17 20 20 1 23 39 16 17 0 0 10 7 15 13 0 10 0 10 13 10 10 0 7 0 14 13 Table III shows the solution procedure.…”
Section: A Description Of Case Studymentioning
confidence: 99%
See 2 more Smart Citations
“…Das et al proposed a multi-objective integrated model of minimum system cost and maximum equipment reliability, and carried out the sensitivity analysis of reliability parameters [12]. Wang et al focused on the problem of insufficient capacity of production line in a car company, and presented the technique of system technology improvement under constraints of limited cost and spaces, and finally predicted indexes including capacity, idleness ratio and blocking rate after technology improvement through simulation [13]. Hou optimized the maintenance policies of production line through combining the failure data, maintenance data, expert opinions and reliability theory [14].…”