“…FSS interfaces lifecycle cost [1,2,4,6,8,10,12,14,16,18,20,22,24] MUSD Cost constraint [20,40,80,∞] MUSD a policy on S. C c is the cost constraint to apply to the architecture of the system being commissioned, which has a cost C sys associated. T is a threshold value of synergy, that in this particular demonstration case we take as equal to the Q-highest value of synergy of the successor states in S. More specifically, in this example we will take Q = 3.…”