2017 Iranian Conference on Electrical Engineering (ICEE) 2017
DOI: 10.1109/iraniancee.2017.7985216
|View full text |Cite
|
Sign up to set email alerts
|

A robust approach to schedule flexible ramp in Real-Time Electricity Market considering Demand Response

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 18 publications
0
1
0
Order By: Relevance
“…The problem is modelled as a bi-level optimization problem which is solved in two iterative steps [29]. In the first step, genetic algorithm (GA) determines the worst situation of uncertainties.…”
Section: Introductionmentioning
confidence: 99%
“…The problem is modelled as a bi-level optimization problem which is solved in two iterative steps [29]. In the first step, genetic algorithm (GA) determines the worst situation of uncertainties.…”
Section: Introductionmentioning
confidence: 99%