A Risk Threshold Calculation Methodology for the Construction Projects Applying Value at Risk

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 4 publications
0
3
0
Order By: Relevance
“…Several studies have implemented control thresholds within the project system based on preexisting or new metrics and indicators to capture deviations in performance proactively by generating early warnings. Kim et al [22] introduced risk thresholds, evaluated through the value-at-risk concept, which would trigger if the profit ratio of the affected work package influences the project profit. Pajares and López-Paredes [23] introduced two monitoring metrics, namely, the cost control index and schedule control index, whose values determine whether early decisions should be made.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Several studies have implemented control thresholds within the project system based on preexisting or new metrics and indicators to capture deviations in performance proactively by generating early warnings. Kim et al [22] introduced risk thresholds, evaluated through the value-at-risk concept, which would trigger if the profit ratio of the affected work package influences the project profit. Pajares and López-Paredes [23] introduced two monitoring metrics, namely, the cost control index and schedule control index, whose values determine whether early decisions should be made.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Below that risk threshold, the organization will accept the risk. Above that risk threshold, the organization will not tolerate the risk [32,33]. In the present study, VaR, an effective risk management tool in the field of finance, is utilized to estimate the risk threshold.…”
Section: Introductionmentioning
confidence: 99%
“…Therefore, it is of great value to define thresholds to describe the minimum magnitudes of rainfall and reservoir fluctuation for changing the landslide movement state and to thus implement an effective tool for landslide risk management in the Three Gorges Reservoir area. The risk threshold, defined as the tolerance criteria for risks that will lead to action, is an effective measure of the degree of uncertainty [32,33]. It has been widely applied as a popular risk management measure in the fields of finance [34], hydrology [35,36], and energy storage operation [37] due to the advantage of conceptual simplicity.…”
Section: Introductionmentioning
confidence: 99%