2016
DOI: 10.14445/22315381/ijett-v36p242
|View full text |Cite
|
Sign up to set email alerts
|

A Review on the experimental study of Overall Equipment Effectiveness of various machines and its improvement strategies through TPM implementation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 6 publications
0
1
0
Order By: Relevance
“…This is obtained with cumulative measure of three separate factors: availability, performance and quality. Together they can provide, with a good measure, of how well your plant is producing (Ayatollahi et al, 2013;Dutta and Dutta, 2016;Puvanasvaran, Teoh and Tay, 2013). OEE can be improved through analysis of the six big losses, and according to Tajiri and Gotoh (1992) the relationship between OEE and losses depends on equipment availability, their performance rates and the quality of the product.…”
Section: Overall Equipment Effectiveness (Oee)mentioning
confidence: 99%
“…This is obtained with cumulative measure of three separate factors: availability, performance and quality. Together they can provide, with a good measure, of how well your plant is producing (Ayatollahi et al, 2013;Dutta and Dutta, 2016;Puvanasvaran, Teoh and Tay, 2013). OEE can be improved through analysis of the six big losses, and according to Tajiri and Gotoh (1992) the relationship between OEE and losses depends on equipment availability, their performance rates and the quality of the product.…”
Section: Overall Equipment Effectiveness (Oee)mentioning
confidence: 99%