2020
DOI: 10.1016/j.conbuildmat.2020.119483
|View full text |Cite
|
Sign up to set email alerts
|

A review on mechanical behavior and design considerations for reinforced-rehabilitated bituminous pavements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
6
2

Relationship

1
7

Authors

Journals

citations
Cited by 22 publications
(3 citation statements)
references
References 97 publications
0
3
0
Order By: Relevance
“…Many scientific proofs encourage using geosynthetic materials as an interlayer between bituminous layers to restrict fatigue cracking and rutting and to delay the appearance of reflective cracking ( 10 ). This rehabilitation solution not only acts as a stress relief and reinforcement layer in the system ( 11 ) but, also compared to a thick overlay, it is much more cost-effective ( 12 ) and sustainable since it allows lower hot mix materials as an overlay, thus decreasing the level of emissions and dissipation of natural sources of materials ( 7 ).…”
Section: Research Backgroundmentioning
confidence: 99%
“…Many scientific proofs encourage using geosynthetic materials as an interlayer between bituminous layers to restrict fatigue cracking and rutting and to delay the appearance of reflective cracking ( 10 ). This rehabilitation solution not only acts as a stress relief and reinforcement layer in the system ( 11 ) but, also compared to a thick overlay, it is much more cost-effective ( 12 ) and sustainable since it allows lower hot mix materials as an overlay, thus decreasing the level of emissions and dissipation of natural sources of materials ( 7 ).…”
Section: Research Backgroundmentioning
confidence: 99%
“…Currently, asphalt pavements are subjected to high traffic volumes generating distresses such as rutting and cracking that need frequent and expensive maintenance [ 1 , 2 ]. In general, there are two fundamental approaches to soothe this issue: one is to frequently mill and apply a new asphalt overlay (mill and fill) at certain intervals of the pavement’s service life [ 3 , 4 , 5 ]. This approach is rather expensive due to a need for renewal over a short period of time, which in turn requires additional financial and material resources and does not correspond with the environmental concerns arising from releasing large amounts of emissions in the air along with high-energy consumption.…”
Section: Introductionmentioning
confidence: 99%
“…The mechanical properties of asphalt mixture can be enhanced by the lateral confinement of the cells. However, little literature ( 26 , 27 ) has provided an insight into the meso-mechanical behavior of geocell-reinforced asphalt mixtures under uniaxial compression. In the first place, numerical simulations of the geocells are not so easy because of their complex 3D honeycomb structure.…”
mentioning
confidence: 99%