2018
DOI: 10.1088/1742-6596/1049/1/012019
|View full text |Cite
|
Sign up to set email alerts
|

A Review of the Dynamic Modelling of Pollution Flashover on High Voltage Outdoor Insulators

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
10
0
1

Year Published

2018
2018
2021
2021

Publication Types

Select...
6
2
1

Relationship

2
7

Authors

Journals

citations
Cited by 14 publications
(11 citation statements)
references
References 7 publications
0
10
0
1
Order By: Relevance
“…Equivalent Salt Deposit Density (SDD) that would produce the defined conductivity has been selected to characterize the severity of polluted insulators. The SDD was determined in compliance with IEC 60507 [20] as indicated in the following formulas:…”
Section: Test Samplementioning
confidence: 99%
“…Equivalent Salt Deposit Density (SDD) that would produce the defined conductivity has been selected to characterize the severity of polluted insulators. The SDD was determined in compliance with IEC 60507 [20] as indicated in the following formulas:…”
Section: Test Samplementioning
confidence: 99%
“…Optimization processes typically consider the CFO (Critical Flashover Overvoltage) parameter associated with the insulators used in distribution networks as a problem restriction, that is if induced overvoltages exceed this value, it is considered that a flashover has occurred. However, modeling the electric arc physical effect caused by flashover is very important to evaluate the real effects of lightning discharges, as presented in [20,21] for insulators subjected to pollution.…”
Section: Introductionmentioning
confidence: 99%
“…In order to understand accurately propagation and growth of pollution flashover, dynamic aspects related to the electrical and environmental criterias shall be considered. Flashover models indicate the greatest probability of flashover occurance on polluted insulators [6]. The model can be use to predict flashover voltage and also to determine several major parameters, such as discharge time, velocity, and leakage current (LC).…”
Section: Introductionmentioning
confidence: 99%