2021 Ieee Africon 2021
DOI: 10.1109/africon51333.2021.9570871
|View full text |Cite
|
Sign up to set email alerts
|

A Review of Test Voltages Used in Partial Discharge Measurements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 34 publications
0
1
0
Order By: Relevance
“…ONPD detection is conducted while the equipment is live, requiring no de-energization or disruption of normal operation [ 3 , 4 , 5 ]; hence, the equipment is subjected to actual conditions that can affect PD activity such as HV stress, temperature, and vibration. On the other hand, OFPD detection is conducted with the equipment disconnected from the network, bringing a complete halt to normal operation [ 6 , 7 , 8 ], and requires the equipment to be energized via external means. OFPD can incur additional costs compared to ONPD because it requires the interruption of service, which can halt the operation of critical utilities that operate continuously.…”
Section: Introductionmentioning
confidence: 99%
“…ONPD detection is conducted while the equipment is live, requiring no de-energization or disruption of normal operation [ 3 , 4 , 5 ]; hence, the equipment is subjected to actual conditions that can affect PD activity such as HV stress, temperature, and vibration. On the other hand, OFPD detection is conducted with the equipment disconnected from the network, bringing a complete halt to normal operation [ 6 , 7 , 8 ], and requires the equipment to be energized via external means. OFPD can incur additional costs compared to ONPD because it requires the interruption of service, which can halt the operation of critical utilities that operate continuously.…”
Section: Introductionmentioning
confidence: 99%