2022
DOI: 10.1007/s42107-022-00501-4
|View full text |Cite
|
Sign up to set email alerts
|

A review of construction management challenges and BIM-based solutions: perspectives from the schedule, cost, quality, and safety management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
21
0
2

Year Published

2023
2023
2024
2024

Publication Types

Select...
5
4
1

Relationship

0
10

Authors

Journals

citations
Cited by 53 publications
(23 citation statements)
references
References 240 publications
0
21
0
2
Order By: Relevance
“…This broader applicability enhances the significance and relevance of the findings in the context of various industries and settings. Parsamehr [ 49 ] proposed a method to improve the accuracy of building maintenance cost estimation, mitigate the risk of overestimating maintenance costs, and optimize maintenance resource allocation. While this method has demonstrated universality in certain application fields, its applicability to other related fields remains limited.…”
Section: Resultsmentioning
confidence: 99%
“…This broader applicability enhances the significance and relevance of the findings in the context of various industries and settings. Parsamehr [ 49 ] proposed a method to improve the accuracy of building maintenance cost estimation, mitigate the risk of overestimating maintenance costs, and optimize maintenance resource allocation. While this method has demonstrated universality in certain application fields, its applicability to other related fields remains limited.…”
Section: Resultsmentioning
confidence: 99%
“…11 [25], [28], [31], [36], [44], [45], [48]- [51], [62], [71]- [74] 35 Increased Visualization Tool that conveys key information to stakeholders improving workflow. 2 [36], [40] 36…”
Section: Simulation Of Discrete Eventsmentioning
confidence: 99%
“…Cheng et al proposed extensible scheduling related to communication scheduling in the context of resource constraint scenarios in an industrial IoT based on learning architecture to reduce the waste of communication resources and ensure real-time communication [18]. Parsamehr et al proposed a method to optimize scheduling using a building information model in the context of resource-constrained schedule, cost, and safety management in building construction, thus optimizing the scheduling of resources while effectively building a construction decision framework [19]. Tavakolan and Nikoukar proposed a hybrid meta-heuristic algorithm based on the analysis of project resources to solve the multi-objective optimization problem in construction project planning [20].…”
Section: Related Workmentioning
confidence: 99%