2020
DOI: 10.1016/j.jclepro.2020.120885
|View full text |Cite
|
Sign up to set email alerts
|

A review for presenting building information modeling education and research in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
23
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 28 publications
(23 citation statements)
references
References 17 publications
0
23
0
Order By: Relevance
“…Compared to the 20th century, the 21st century is well ahead in terms of technology, innovation and digitalization, and is also on the rise [ 55 , 143 ]. For example, BIM is the latest and emerging DT of the 21st century; no doubt the BIM idea was developed in the 20th century [ 144 ], but BIM reached its height in the 21st century [ 145 , 146 ]. Thus, BIM is a growing area of study and practice that integrates the diverse information domains of the AEC industry [ 147 ].…”
Section: Resultsmentioning
confidence: 99%
“…Compared to the 20th century, the 21st century is well ahead in terms of technology, innovation and digitalization, and is also on the rise [ 55 , 143 ]. For example, BIM is the latest and emerging DT of the 21st century; no doubt the BIM idea was developed in the 20th century [ 144 ], but BIM reached its height in the 21st century [ 145 , 146 ]. Thus, BIM is a growing area of study and practice that integrates the diverse information domains of the AEC industry [ 147 ].…”
Section: Resultsmentioning
confidence: 99%
“…Due to the special needs of young people in terms of learning and growth, the special focus of education buildings must be user comfort while using as little energy as possible [16]. Therefore, the design optimization approach of education buildings must be a multi-objective optimization approach, taking into account various factors at the same time.…”
Section: Optimization Of Educational Architecture Designmentioning
confidence: 99%
“…Combining BIM management technology and characteristics of military engineering projects, this article analyzes the risks of military engineering project management BIM application from four aspects: organization, economy and management, engineering environment, and technology. By consulting a large amount of data, summarizing relevant risk factors [4,[11][12][13][14] , and conducting interviews with experts in related fields such as engineering management and BIM application, it is planned to focus on four aspects: organizational risk, economic and management risk, engineering environmental risk, and technical risk.…”
Section: Risk Identification Of Bim Application In Military Engineering Project Managementmentioning
confidence: 99%
“…Due to the particularity of military engineering projects, there are still many problems in management [1][2] . BIM (Building Information Modeling), as a hot spot of current engineering projects and the key technology of future construction engineering informatization, although it started late, its application in china has developed significantly [4,[3][4][5][6] . Various researches on BIM, from the beginning of the technical level of virtual reality, collaborative design and visualization as the focus, to the later full life cycle BIM management and teaching reform as the research direction, reflecting that BIM is not only a technology, but also A new management method [3,[7][8][9] .…”
Section: Introductionmentioning
confidence: 99%