Proceedings 16th International Parallel and Distributed Processing Symposium 2002
DOI: 10.1109/ipdps.2002.1016485
|View full text |Cite
|
Sign up to set email alerts
|

A reliability-aware value-based scheduler for dynamic multiprocessor real-time systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2002
2002
2020
2020

Publication Types

Select...
4
2
1

Relationship

2
5

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 10 publications
0
4
0
Order By: Relevance
“…The FARM methodology combines feedback control based scheduling, path based paradigm, and value based scheduling [17], [18], [19]. Figure 5 shows the schematic of the proposed methodology wherein the control variables, namely, the manipulated variable, controlled variable, set point, and the actuation mechanisms are identified.…”
Section: Our Farm Methodologymentioning
confidence: 99%
See 1 more Smart Citation
“…The FARM methodology combines feedback control based scheduling, path based paradigm, and value based scheduling [17], [18], [19]. Figure 5 shows the schematic of the proposed methodology wherein the control variables, namely, the manipulated variable, controlled variable, set point, and the actuation mechanisms are identified.…”
Section: Our Farm Methodologymentioning
confidence: 99%
“…Since AHSCS has many transient and Quasicontinuous paths, dynamic value-based fault-tolerant scheduling (such as the one proposed in [19]) needs to be developed.…”
Section: A Value-based Performability Index and Schedulingmentioning
confidence: 99%
“…Thus, value-based scheduling is a decision problem involving the choice of tasks to execute so that the overall system value is maximized [2]. However, like many other practical instances of scheduling, this problem is also intractable and hence several heuristics have been proposed [3][4] [5].…”
Section: Introductionmentioning
confidence: 99%
“…Thus, value-based scheduling is a decision problem involving the choice of tasks to execute so that the overall system value is maximized [7]. However, this problem is also intractable and several heuristics have been proposed [8,9].…”
Section: Overload Handling In Real-time Systemsmentioning
confidence: 99%