2016
DOI: 10.1080/15578771.2016.1202355
|View full text |Cite
|
Sign up to set email alerts
|

A Quantitative Study of the Relationship between Project Performance and BIM Use on Commercial Construction Projects in the USA

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 10 publications
0
2
0
Order By: Relevance
“…The close-ended questionnaire based on a three-point Likert scale (such as 1 to 3: from 1 agree to 3 disagree) was used which assisted in evaluating the participants' opinion about ISO 9001. The rationale for using the questionnaire was that it enabled the researcher to collect the relevant data speedily and cost-effectively (Manders et al, 2016); this instrument was also used on account of its relevance in the previously conducted similar work (Hatamleh et al, 2018;Jong et al, 2019;Kelly and Ilozor, 2019).…”
Section: Data Collectionmentioning
confidence: 99%
“…The close-ended questionnaire based on a three-point Likert scale (such as 1 to 3: from 1 agree to 3 disagree) was used which assisted in evaluating the participants' opinion about ISO 9001. The rationale for using the questionnaire was that it enabled the researcher to collect the relevant data speedily and cost-effectively (Manders et al, 2016); this instrument was also used on account of its relevance in the previously conducted similar work (Hatamleh et al, 2018;Jong et al, 2019;Kelly and Ilozor, 2019).…”
Section: Data Collectionmentioning
confidence: 99%
“…Based on these features BIM can be a very effective platform for performing risk management (Bråthen & Moum, 2016;Farnsworth et al, 2015;Kelly & Ilozor, 2016;Lam et al, 2017;Eadie et al, 2013;Bryde et al, 2013;Ciribini et al, 2016), which is one of the most important aspects when planning and developing a construction project (Zou et al, 2017). BIM can specifically help in handling the high complexity which is inherent in modern constructions at the development and operation phases and hinders control of quality, time and cost in a project (Bryde et al, 2013).…”
Section: Introductionmentioning
confidence: 99%