2016 International Conference on Innovations in Science, Engineering and Technology (ICISET) 2016
DOI: 10.1109/iciset.2016.7856518
|View full text |Cite
|
Sign up to set email alerts
|

A prospective model of Bangladesh electricity market

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…Due to the expansion of the electricity market, the unbundled electricity power system is now regulated by Regional Transmission Organizations (RTO) and Independent System Operator (ISO) to assure security, reliability, and quality of the electrical power services. The restructured power market parted as Generation Company (GenCOs), Distribution Company (Discos), and Transmission Company (TransCOs) [18]- [20]. The existing power systems became limited to transmit generated power from central generation to distribution systems due to aging because most of the power systems are more than 40 years old.…”
Section: The Impact Of Reactive Power (Qcap) In the Verticallymentioning
confidence: 99%
“…Due to the expansion of the electricity market, the unbundled electricity power system is now regulated by Regional Transmission Organizations (RTO) and Independent System Operator (ISO) to assure security, reliability, and quality of the electrical power services. The restructured power market parted as Generation Company (GenCOs), Distribution Company (Discos), and Transmission Company (TransCOs) [18]- [20]. The existing power systems became limited to transmit generated power from central generation to distribution systems due to aging because most of the power systems are more than 40 years old.…”
Section: The Impact Of Reactive Power (Qcap) In the Verticallymentioning
confidence: 99%