A proactive scheduling approach to steel rolling process with stochastic machine breakdown

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
6
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 15 publications
(7 citation statements)
references
References 48 publications
0
6
0
Order By: Relevance
“…Zandieh et al 5 conducted an integrated optimization study on shop scheduling and preventive maintenance in FJSP by focusing on maximum completion time and system unavailability as optimization objectives. Considering the single-machine system problem, Wang et al 6 designed a multi-objective evolutionary algorithm based on the support vector regression proxy index to determine the processing order of a workpiece and the input of equipment maintenance resources. The flow shop scheduling problem with random failures was studied by Zhang et al 7 .…”
Section: Related Workmentioning
confidence: 99%
“…Zandieh et al 5 conducted an integrated optimization study on shop scheduling and preventive maintenance in FJSP by focusing on maximum completion time and system unavailability as optimization objectives. Considering the single-machine system problem, Wang et al 6 designed a multi-objective evolutionary algorithm based on the support vector regression proxy index to determine the processing order of a workpiece and the input of equipment maintenance resources. The flow shop scheduling problem with random failures was studied by Zhang et al 7 .…”
Section: Related Workmentioning
confidence: 99%
“…A common approach to deal with uncertainty in machine scheduling problems is stochastic programming (SP), which assumes that the distributions of random variables are known (like normal 24 or exponential 25 distribution). To enhance the robustness and hedge against the risk of unacceptable scenarios, Ranjbar et al 26 and Pishevar et al 27 applied β-robust method to the parallel machine scheduling problem, in which the processing time follows a normal distribution and the likelihood of exceeding some performance measure is minimized.…”
Section: Related Workmentioning
confidence: 99%
“…In another study (Nwanya et al, 2017), the authors apply multiple regression for optimizing machine downtime in plastic manufacturing. Wang et al (2017) also applied multiple regression analysis to evaluate downtimes and other equipment performance characteristics, such as cycle time, capacity, weight and overall equipment effectiveness (OEE). Table 2 presents the comparison of this study with the previous downtime studies.…”
Section: Related Workmentioning
confidence: 99%