2023
DOI: 10.21837/pm.v21i29.1370
|View full text |Cite
|
Sign up to set email alerts
|

A Preliminary Framework for Preventing Disputes in Different Stages of Building Construction Projects

Nur Nadhirah Muhammuddin,
Mohd Suhaimi Mohd-Danuri,
Mahanim Hanid
et al.

Abstract: The upward trend of dispute claims and occurrences throughout different stages has detrimentally affected the outcomes of construction projects. Building upon two major themes from a systematic literature review (SLR) study, Principal Component Analysis (PCA) was performed to further group the extensive causes and strategies into several meaningful groups using the Statistical Social Package Science (SPSS) software. Questionnaires were used and issued to three main stakeholders (clients, consultants, and contr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…As for the backbone of intermediate business, there is a lack of technical talents who understand modern engineering technology, with rich professional knowledge and solid skills, and are familiar with modern economic and legal knowledge (Zheng, 2020). Therefore, it is necessary to establish a training and continuing education system to adapt to different levels of personnel, such as carry out national exchanges, in line with international standards, learn from the British Royal Chartered Surveyors, Hong Kong quantity surveyors training system, and gradually establish a high-end talent team (Ekundayo, 2020;Muhammuddin et al, 2023;Wu & Li, 2020).…”
Section: Strengthen the Team Building Of Professional And Technical P...mentioning
confidence: 99%
“…As for the backbone of intermediate business, there is a lack of technical talents who understand modern engineering technology, with rich professional knowledge and solid skills, and are familiar with modern economic and legal knowledge (Zheng, 2020). Therefore, it is necessary to establish a training and continuing education system to adapt to different levels of personnel, such as carry out national exchanges, in line with international standards, learn from the British Royal Chartered Surveyors, Hong Kong quantity surveyors training system, and gradually establish a high-end talent team (Ekundayo, 2020;Muhammuddin et al, 2023;Wu & Li, 2020).…”
Section: Strengthen the Team Building Of Professional And Technical P...mentioning
confidence: 99%