1967
DOI: 10.2118/67-01-01
|View full text |Cite
|
Sign up to set email alerts
|

A Practical Protection of Edmonton-Hardisty Capsule Pipelining: Trunkline Test

Abstract: The first trunkline test of capsule pipeline flow was carried out jointly from March 10 to 12, 1965, by the Research Council of Alberta and the Interprovincial Pipe Line Company. The Interprovincial system runs from Edmonton to Toronto, and the test was run in the 109-mile section of the 20-in.-O.D. No. 1 line from Edmonton to Hardisty. The capsule, which was 16 ins. in diameter and about 50 ins. long, consisted of a steel shell filled with crude oil and weighed 514 lbs. The velocity of the capsule was determi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

1980
1980
2017
2017

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 6 publications
0
0
0
Order By: Relevance