1998
DOI: 10.1016/s0166-3615(98)00078-5
|View full text |Cite
|
Sign up to set email alerts
|

A practical approach to recipe improvement and optimization in the batch processing industry

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
13
0

Year Published

2004
2004
2011
2011

Publication Types

Select...
4
3
1

Relationship

0
8

Authors

Journals

citations
Cited by 29 publications
(13 citation statements)
references
References 11 publications
0
13
0
Order By: Relevance
“…Finally, a control recipe, starting as a copy of the master recipe, contains detailed information for minute-to-minute process operation of a single batch [4]. These four types of recipes could address the long-term planning production very well, however does not have a recipe type to describe the dynamic market demands of the production schedule that is what batch corporations call for today.…”
Section: A Recipes In Isa S88 Standardmentioning
confidence: 99%
“…Finally, a control recipe, starting as a copy of the master recipe, contains detailed information for minute-to-minute process operation of a single batch [4]. These four types of recipes could address the long-term planning production very well, however does not have a recipe type to describe the dynamic market demands of the production schedule that is what batch corporations call for today.…”
Section: A Recipes In Isa S88 Standardmentioning
confidence: 99%
“…Four classes of solution methods for multi-objective optimization problems can be distinguished, see Verwater-Lukszo (1996):…”
Section: (Multi-criteria) Optimization Problemmentioning
confidence: 99%
“…When the batch goes into the flexible scheduling interval at (1 ) fix d t T , the decision whether to break off the batch or not must be made. At fix d t T , the judgment whether to extend cultivation of the batch or not should be done.…”
Section: Scheduling Strategy For Flexible Termination Intervalsmentioning
confidence: 99%
“…At fix d t T , the judgment whether to extend cultivation of the batch or not should be done. While at (1 ) fix d t T , the scheduled batch must be terminated immediately.…”
Section: Scheduling Strategy For Flexible Termination Intervalsmentioning
confidence: 99%
See 1 more Smart Citation