2004
DOI: 10.1063/1.1766869
|View full text |Cite
|
Sign up to set email alerts
|

A Posteriori Error Estimation And Three-dimensional Adaptive Remeshing: Application To Error Control Of Non-Steady Metal Forming Simulations

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2009
2009
2018
2018

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…Dealing with problems of metal forming process and mechanical structure, the element error is generally given, according to the norm of energy [18,19]. It expresses the difference between the exact stress σ and the FE one σ h :…”
Section: A Posteriori Error Estimationmentioning
confidence: 99%
See 2 more Smart Citations
“…Dealing with problems of metal forming process and mechanical structure, the element error is generally given, according to the norm of energy [18,19]. It expresses the difference between the exact stress σ and the FE one σ h :…”
Section: A Posteriori Error Estimationmentioning
confidence: 99%
“…Usually, this relation can be established with the using either of the following two strategies: The first allows us to calculate an optimal mesh for a prescribed accuracy, while the second seeks to optimize a mesh under the constraint of a number of degrees of freedom attached. One may refer to [18,19] for more details, which used a combination of them. The first strategy is used to compute an optimized new mesh.…”
Section: Size Map For Adaptive Strategiesmentioning
confidence: 99%
See 1 more Smart Citation
“…Tetrahedral elements were used in the analysis, and different polynomials were used in the least squares fitting for the SPR method, possessing C 0 , C 1 and C 2 continuity. In [56], an improvement of the SPR method, i.e. minimal patch recovery (MPR), was introduced in which there was no need to calculate the nodal stresses.…”
Section: Error Estimationmentioning
confidence: 99%