2022
DOI: 10.1007/s12517-022-09537-x
|View full text |Cite
|
Sign up to set email alerts
|

A performance-oriented adaptability assessment method for TBM tunneling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 26 publications
0
1
0
Order By: Relevance
“…To study the adaptability of EPB shield in expansive clay layer, Song et al [15] proposed the target design of shield selection, and the selection of excavation parameters, based on the Xuzhou Metro Line 2 phase I project. Lin et al [16] used analytic hierarchy process (AHP) to construct the TBM adaptability evaluation index system. Based on the membership function, a performance-oriented TBM tunneling adaptability evaluation method is established.…”
Section: The Introductionmentioning
confidence: 99%
“…To study the adaptability of EPB shield in expansive clay layer, Song et al [15] proposed the target design of shield selection, and the selection of excavation parameters, based on the Xuzhou Metro Line 2 phase I project. Lin et al [16] used analytic hierarchy process (AHP) to construct the TBM adaptability evaluation index system. Based on the membership function, a performance-oriented TBM tunneling adaptability evaluation method is established.…”
Section: The Introductionmentioning
confidence: 99%