2020 IEEE 3rd Student Conference on Electrical Machines and Systems (SCEMS) 2020
DOI: 10.1109/scems48876.2020.9352363
|View full text |Cite
|
Sign up to set email alerts
|

A Partitioning Method for Parallel Power System Restoration Based on Virus Propagation Model

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 15 publications
0
2
0
Order By: Relevance
“…Furthermore, [68,69] have proposed simplified partitioning procedures, which divide the network into a number of islands based on an optimization problem and virus propagation model-based method, respectively. 6.2.…”
Section: Islanding Strategymentioning
confidence: 99%
See 1 more Smart Citation
“…Furthermore, [68,69] have proposed simplified partitioning procedures, which divide the network into a number of islands based on an optimization problem and virus propagation model-based method, respectively. 6.2.…”
Section: Islanding Strategymentioning
confidence: 99%
“…the sequence of switching [93] Comparison of different black start units [57] Graph theory-based islanding (parallel restoration) [59] DPSO based-islanding (parallel restoration) [61] Grid partitioning based on virus propagation model [69] A procedural approach to check the feasibility of a restoration strategy [86] An optimization to control SPA and minimize unsupplied load in bottomup restoration [89] Grid code for great Britain [33] UK dep. for business, energy and industrial strategy electricity, system restoration standard [31] California ISO, reliability coordinator area restoration Plan [30] PJM manual, system restoration [29] System restoration plan [28] IGMC, executive method for restoration [27] Review on network reconfigure-tion [4] Analyzing black-start capability of wind farms [103] Determination of optimal path to NBSUs considering priority and loads characteristics [78] PMUs sequential restoration plan [56] 2022 Principles and practices of restoration [11] in the black-start procedure have been assessed.…”
Section: Application Of Renewable and Vsc-based Resources In Power Gr...mentioning
confidence: 99%