1997
DOI: 10.1080/002075497194651
|View full text |Cite
|
Sign up to set email alerts
|

A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
26
0
4

Year Published

2000
2000
2021
2021

Publication Types

Select...
6
4

Relationship

0
10

Authors

Journals

citations
Cited by 49 publications
(31 citation statements)
references
References 0 publications
0
26
0
4
Order By: Relevance
“…El único dato relevante es el ratio de aparición esperado. Podríamos admitir por tanto que Monden plantea un problema dinámico, que luego es mejorado en (Monden, 1993) y en (Aigbedo y Monden, 1997). Los modelos matemáticos que sí requieren que todos los productos sean conocidos y estén disponibles son posteriores a (Monden, 1987).…”
Section: El Problema De Secuenciación Dinámicounclassified
“…El único dato relevante es el ratio de aparición esperado. Podríamos admitir por tanto que Monden plantea un problema dinámico, que luego es mejorado en (Monden, 1993) y en (Aigbedo y Monden, 1997). Los modelos matemáticos que sí requieren que todos los productos sean conocidos y estén disponibles son posteriores a (Monden, 1987).…”
Section: El Problema De Secuenciación Dinámicounclassified
“…These solutions include exact procedures based on branchand-bound ( [16]), dynamic programming ( [3], [17], [18]), heuristic procedures based on local search ( [19]), greedy algorithms with priority rules ( [19], [20]), metaheuristics ( [21]) and beam search ( [22]). Several studies have also considered the multi-criteria option (( [23], [24], [25], [26]). …”
Section: Preliminariesmentioning
confidence: 99%
“…Additionally, the contribution MAS (multi-agent system) is considered. [ | ] M, P Aigbedo (2004) [P, euc | ] P Aigbedo and Monden (1996) [O, euc; P, euc | ] C Aigbedo and Monden (1997) [O, euc; P, euc; W, euc | k, n] M, HS Balinski and Shahidi (1998) [ Cakir and Inman (1993) [P, abs | ] M, HS Caridi and Sianesi (2000) [P | n 4,w ] M, MAS Cheng and Ding (1996) [ | ] M, HS, C Ding and Cheng (1993a+b) [ | ] M, HS Ding et al (2006) [O; P ; W | k] P, V, HS Duplaga et al (1996) [P | ] HS Duplaga and Bragg (1998) [ HS Inman and Bulfin (1991) [ HS Inman and Bulfin (1992) [P | n 4,w ] M, HS Korkmazel and Meral (2001) [ Kubiak and Sethi (1991) [ | ] M, E Kubiak and Sethi (1994) [ Kurashige et al (1999Kurashige et al ( , 2002 [W, euc | k] M, HS, HM Leu et al (1996) [P | ] HM Leu et al (1997) [ Miltenburg and Goldstein (1991) [P ; W | n w , k] M, HS, P Miltenburg and Sinnamon (1989) [P | n 4,w ] M, HS Miltenburg and Sinnamon (1992) [P | n w ] M, HS Miltenburg and Sinnamon (1995) [P | n 4,w ] P Miltenburg et al (1990) [ | ] M, E Monden (1998) [P | ] HS Morabito and Kraus (1995) [P | n 4,w ] M, P, HS Moreno and Corominas (2006) [abs, minmax | ] M, E Ng and Mak (1994) [ | ] M, B, E Steiner and Yeomans (1993) [abs, minmax | ] M, P, E Steiner and Yeomans (1996) [P, abs, minmax | n] M, P, E Sumichrast and Clayton (1996) [ Both "minimization of work overload" and "leveling part usage" turned out to be valuable but often conflicting objectives for model sequencing. Consequently, several hybrid approaches have been developed.…”
Section: Operational Characteristicsmentioning
confidence: 99%