2012
DOI: 10.1016/j.apm.2011.11.050
|View full text |Cite
|
Sign up to set email alerts
|

A novel two-phase group decision making approach for construction project selection in a fuzzy environment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
51
0
1

Year Published

2012
2012
2020
2020

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 132 publications
(52 citation statements)
references
References 51 publications
0
51
0
1
Order By: Relevance
“…Peng [115] combined VIKOR, TOPSIS, ELECTRE III, GRA, PROMETHEE II, and weighted sum model (WSM) for assessment of earthquake vulnerability, Zolfani et al [116] combined the VIKOR and SWARA for selection of mechanical longitudinal ventilation of tunnel pollutants, Ginevičius et al [117] combined the VIKOR and TOPSIS for assessment of alternatives of wall insulation, Zavadskas and Antuchevičiene [118] integrated the VIKOR and TOPSIS for ranking of building redevelopment, Mela et al [119] integrated VIKOR with weighted product method, TOPSIS and PROMETHEE II, weighted sum method for evaluation of building design, Pamučar andĆirović [120] presented new model based on DEMATEL-Multi-Attributive Border Approximation area Comparison (MABAC) for decision assessment on the acquisition of manipulative transport. Ebrahimnejad et al [121], integrated a modified ANP with the VIKOR for selection construction project. Totally, 14 articles used the VIKOR technique in the fields of Construction Management (Table 3).…”
Section: Construction Managementmentioning
confidence: 99%
“…Peng [115] combined VIKOR, TOPSIS, ELECTRE III, GRA, PROMETHEE II, and weighted sum model (WSM) for assessment of earthquake vulnerability, Zolfani et al [116] combined the VIKOR and SWARA for selection of mechanical longitudinal ventilation of tunnel pollutants, Ginevičius et al [117] combined the VIKOR and TOPSIS for assessment of alternatives of wall insulation, Zavadskas and Antuchevičiene [118] integrated the VIKOR and TOPSIS for ranking of building redevelopment, Mela et al [119] integrated VIKOR with weighted product method, TOPSIS and PROMETHEE II, weighted sum method for evaluation of building design, Pamučar andĆirović [120] presented new model based on DEMATEL-Multi-Attributive Border Approximation area Comparison (MABAC) for decision assessment on the acquisition of manipulative transport. Ebrahimnejad et al [121], integrated a modified ANP with the VIKOR for selection construction project. Totally, 14 articles used the VIKOR technique in the fields of Construction Management (Table 3).…”
Section: Construction Managementmentioning
confidence: 99%
“…Thipparat and Thaseepetch (2013) presented an integrated VIKOR and fuzzy AHP method for assessing a sustainable research project. Ebrahimnejad et al (2012) proposed a two-phase group decision making approach for construction project selection under a fuzzy environment. In their method, they integrated a modified ANP and an improved VIKOR.…”
Section: Vikormentioning
confidence: 99%
“…For convenience, we convert the linguistic variables in X k into the IFNs and the grades h k into their weights, shown as: Y k =(y k ij ) m n ; w k =(w k 1 ; w k 2 ; ; w k n ); k 2T; (13) where y k ij = ( k ij ; k ij )(i 2 M; j 2 N; k 2 T ) are IFNs. w k j (j 2 N; k 2 T ) are the weights of attributes, with 0 w k j 1 and P n j=1 w k j = 1.…”
Section: Determining the Weights Of Decision Makersmentioning
confidence: 99%
“…For example, Chen et al [12] introduced a GDM based on intuitionistic fuzzy sets and evidential reasoning methodology. Ebrahimnejad et al [13] presented a novel two-phase GDM approach for construction project selection in a fuzzy environment. Vahdani et al [14] developed a compromise solution method for fuzzy GDM problems with an application in the contractor selection.…”
Section: Introductionmentioning
confidence: 99%