“…ORB control ensures MPPT using a precalculated look-up table which is structured with the aid of knowledge of optimum relationships among various system parameters [10,27,28,43,63,82,120,142,154,157,164]; for instance, the power versus shaft speed [27,90,165], the power versus torque [157,166,167], the power versus rectified dc-link voltage [63] and the dc-link voltage and dc-side current [142]. The ORB control is simple to implement, has good dynamic response, requires no wind speed sensor, can produce smoother output power when compared with the other strategies and is widely used in commercial WECSs [23,154,168].…”