2021
DOI: 10.1002/smr.2420
|View full text |Cite
|
Sign up to set email alerts
|

A novel approach for visualization, monitoring, and control techniques for Scrum metric planning using the analytic hierarchy process

Abstract: Although Scrum is one of the most preferred agile development frameworks that guide the development process, measuring sprint productivity is still challenging. In fact, it is hard to provide a continuous measurement during consecutive Scrum sprints, especially selecting the optimal metrics that fit better for real industrial applications. To bridge this gap, we conducted an industrial case study within the TÜBİTAK SAGE software development group to demonstrate the performance and applicability of a systematic… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 43 publications
0
1
0
Order By: Relevance
“…This happened twice during the academic project of mobile solution development and once during the commercial one. If minor issues related to declared availability were reported by some contributors, new team members could be addedwhich is convergent with a study by Tekin et al [46]. This solution was used across four student Sprints, and only once during the execution of the commercial project.…”
Section: Development Team Structurementioning
confidence: 70%
“…This happened twice during the academic project of mobile solution development and once during the commercial one. If minor issues related to declared availability were reported by some contributors, new team members could be addedwhich is convergent with a study by Tekin et al [46]. This solution was used across four student Sprints, and only once during the execution of the commercial project.…”
Section: Development Team Structurementioning
confidence: 70%
“…In addition, in agile development, it is necessary to measure the effectiveness and efficiency of the processes using metrics. Planning and monitoring are necessary for projects developed in Scrum [22]. Previous works developed by Almeida & Carneiro [23], Kurnia et al [24], and López et al [25] were important in synthesizing these metrics considering the whole Scrum development cycle and its ceremonies.…”
Section: Introductionmentioning
confidence: 99%