2013
DOI: 10.1109/tpwrd.2013.2268249
|View full text |Cite
|
Sign up to set email alerts
|

A Noncommunication Adaptive Single-Pole Autoreclosure Scheme Based on the ACUSUM Algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
34
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 52 publications
(34 citation statements)
references
References 17 publications
0
34
0
Order By: Relevance
“…The maximum secondary arc current of the outgoing line phase A was calculated as 30.1 A. 29,30 According to Equation (19) and the parameters shown in Table 1, the setting value of this TFI method can be calculated as 48.47 kW. The simulation results are presented in Figures 6 and 7.…”
Section: Simulation Results Of Tfi Methods Based On Active Power Rmsmentioning
confidence: 99%
See 2 more Smart Citations
“…The maximum secondary arc current of the outgoing line phase A was calculated as 30.1 A. 29,30 According to Equation (19) and the parameters shown in Table 1, the setting value of this TFI method can be calculated as 48.47 kW. The simulation results are presented in Figures 6 and 7.…”
Section: Simulation Results Of Tfi Methods Based On Active Power Rmsmentioning
confidence: 99%
“…TFI methods based on magnitude of faulty phase voltage or current . These methods claim that, after the fault extinction, magnitude of faulty phase voltage or current is much bigger than that before the fault extinction.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…These features have shown their effectiveness in classifying power quality disturbances . Usually, voltage depressions due to faults are deeper than other normal events; therefore, the features Fs4 to Fs7 cause to discriminate three‐phase faults from capacitor exiting and load switching events.…”
Section: Fault Detection Methodsmentioning
confidence: 99%
“…In the case of multiple-phase faults, protection scheme trips all three phases of faulted line and blocks SPT&R, which is a common procedure in field applications. 22,23 After single-phase faults are detected and cleared, SPT&R is initiated and SPR success indicator is activated in both relays only for faulted phase. Afterwards, when no voltage period ends, SPR of faulted phase is initiated and SPR success indicator determines presence of the fault.…”
Section: Proposed Transverse Differential Protection Schemementioning
confidence: 99%