2013
DOI: 10.7708/ijtte.2013.3(1).09
|View full text |Cite
|
Sign up to set email alerts
|

A New Way for Physical Progress Monitoring in High Tech Infrastructure Construction

Abstract: This paper presents the project of designing an agile physical progress measurement system for the construction management department of a multinational company operating in turnkey railway projects field. It has been pointed out that the classical physical progress measurement, based on Earn Value Management (EVM) and so financially based, is not suitable for modern high-tech and, in one word, complex, construction projects. So it has been looked for something different, more agile, to easily fix the problem … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
0
1
0
Order By: Relevance
“…The choice of KPIs as the best approach in our study was justified because it was used in similar research, including research on performance systems for local authorities [72], high tech infrastructure construction [73], road freight transport [74], decarbonising supply chains [75], product-service system lifecycles [76], environmentally sustainable, energy-efficient ports [67], agent-based simulation in urban logistics [77], public transport [78] and smart city (e.g., tracking, citizens) [79]. Usually, KPIs are divided into groups and have their own scales.…”
Section: Kpismentioning
confidence: 99%
“…The choice of KPIs as the best approach in our study was justified because it was used in similar research, including research on performance systems for local authorities [72], high tech infrastructure construction [73], road freight transport [74], decarbonising supply chains [75], product-service system lifecycles [76], environmentally sustainable, energy-efficient ports [67], agent-based simulation in urban logistics [77], public transport [78] and smart city (e.g., tracking, citizens) [79]. Usually, KPIs are divided into groups and have their own scales.…”
Section: Kpismentioning
confidence: 99%