2021
DOI: 10.1016/j.procs.2021.01.192
|View full text |Cite
|
Sign up to set email alerts
|

A new surrogate measure for resilient approach to construction scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
12
0
1

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
2
1
1

Relationship

1
5

Authors

Journals

citations
Cited by 8 publications
(13 citation statements)
references
References 18 publications
0
12
0
1
Order By: Relevance
“…The concept of resilient scheduling is built on the idea of providing enough time intervals in the initial baseline structure so the schedule is able to absorb disturbances caused by the impact of uncertainty. A common approach is to provide enough time floats in the initial solution by the use of different surrogate measures [28][29][30]61,62]. This way, the stability of a schedule is approximated under the low cost of computational complexity, providing a simple solution in the overall computationally demanding optimization process.…”
Section: Surrogate Measure and Activity Weightsmentioning
confidence: 99%
See 4 more Smart Citations
“…The concept of resilient scheduling is built on the idea of providing enough time intervals in the initial baseline structure so the schedule is able to absorb disturbances caused by the impact of uncertainty. A common approach is to provide enough time floats in the initial solution by the use of different surrogate measures [28][29][30]61,62]. This way, the stability of a schedule is approximated under the low cost of computational complexity, providing a simple solution in the overall computationally demanding optimization process.…”
Section: Surrogate Measure and Activity Weightsmentioning
confidence: 99%
“…The surrogate measure in this study is modeled as a weighted sum of resourcetechnology free floats [30] of all activities in a project. The resource-technology free float (FF i ) calculates the amount of time for which an activity can be prolonged without postponing start times of succeeding activities, in a way that both precedence and resource relations are considered.…”
Section: Surrogate Measure and Activity Weightsmentioning
confidence: 99%
See 3 more Smart Citations