2008
DOI: 10.2118/105200-pa
|View full text |Cite
|
Sign up to set email alerts
|

A New Rate-Allocation-Optimization Framework

Abstract: Summary Determination of the operating conditions of a field under a set of physical system constraints (e.g., compressor limits) and engineering preferences (e.g., voidage replacement) is a primary concern for petroleum engineers. Rule-based systems have been proposed for this, but the process is most suitably defined as an optimization problem. An optimization procedure that uses mixed-integer linear programming (MILP) is discussed in this study. Well rates that honor system and engineering… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2012
2012
2023
2023

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 22 publications
(3 citation statements)
references
References 12 publications
0
3
0
Order By: Relevance
“…This can be extended to other dual string wells within the same field. Injecting just the right amount of gas lift for the desired production is the principle concern for operators of mature fields where the amount of gas lift available is often constrained by the existing facility system, the lift gas compressors [26]. The opportunities to enhance the production can also be realized through the optimizing of parameters such as the casing head pressure, injection depth and orifice size.…”
Section: Features Advantages and Limitations Of The Proposed Hybrid mentioning
confidence: 99%
“…This can be extended to other dual string wells within the same field. Injecting just the right amount of gas lift for the desired production is the principle concern for operators of mature fields where the amount of gas lift available is often constrained by the existing facility system, the lift gas compressors [26]. The opportunities to enhance the production can also be realized through the optimizing of parameters such as the casing head pressure, injection depth and orifice size.…”
Section: Features Advantages and Limitations Of The Proposed Hybrid mentioning
confidence: 99%
“…The presence of discrete decision variables complicates the optimization problem by transforming a linear program (LP) or a nonlinear program (NP) into a mixed integer linear program (MILP) or a mixed integer nonlinear program (MINLP), respectively. Guyaguler and Byer (2008) and Kosmidis, Perkins, and Pistikopoulos (2005) discuss RTPO in the context of MILP while Selot, Kuok, Robinson, Mason, and Barton (2008) use a MINLP formulation.…”
Section: Real-time Production Optimizationmentioning
confidence: 99%
“…Generally, in the absence of the production data of a single well, several models can be established to calculate the production. For instance, the inflow performance relationship and hydraulic lifting curves [3][4][5][6][7], reservoir response model, or tailored reservoir model [8][9][10], and the temperature-pressure models [11,12] can be used to calculate the production rate of a single well. However, the above models could not consider the constraint of the production of a multi-well-monitor system.…”
Section: Introductionmentioning
confidence: 99%