A new OPF based distribution system restoration method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0
2

Year Published

2017
2017
2019
2019

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(11 citation statements)
references
References 27 publications
0
9
0
2
Order By: Relevance
“…y uncertain = y + ∆y (25) where Pg uncertain are the uncertainties regarding the active power produced by conventional generators, necessary for energy reserve analysis; V uncertain are the uncertainties regarding the nodal voltage magnitudes, necessary to analyze the accomplishment of the limits imposed by the regulatory authorities; t uncertain are the uncertainties regarding the active power flows through circuit breakers, necessary to verify the correct sizing of these devices by the rated current; and y uncertain are the uncertainties regarding the other electrical quantities that can be used according to necessity. In summary, the uncertainties of EPS electrical quantities are determined, in the second stage, by the sum of deterministic variables (determined in the first stage) and fuzzy variables.…”
Section: Electrical Quantity Uncertainties Of Eps: Second Stagementioning
confidence: 99%
See 2 more Smart Citations
“…y uncertain = y + ∆y (25) where Pg uncertain are the uncertainties regarding the active power produced by conventional generators, necessary for energy reserve analysis; V uncertain are the uncertainties regarding the nodal voltage magnitudes, necessary to analyze the accomplishment of the limits imposed by the regulatory authorities; t uncertain are the uncertainties regarding the active power flows through circuit breakers, necessary to verify the correct sizing of these devices by the rated current; and y uncertain are the uncertainties regarding the other electrical quantities that can be used according to necessity. In summary, the uncertainties of EPS electrical quantities are determined, in the second stage, by the sum of deterministic variables (determined in the first stage) and fuzzy variables.…”
Section: Electrical Quantity Uncertainties Of Eps: Second Stagementioning
confidence: 99%
“…These values are used in the second stage (Section 2.2-Equations (17)-(21)) of the proposal methodology, in order to determine the fuzzy variables of EPS electrical quantities. The uncertainties of EPS electrical quantities are then computed by the sum of deterministic variables, determined in the first stage, and fuzzy variables, determined in the second stage, as discussed in Section 2.2-Equations (22)(23)(24)(25).…”
Section: Test System Datamentioning
confidence: 99%
See 1 more Smart Citation
“…This problem has also been approached using the meta-heuristic algorithms [16],fuzzy technology [17], multi-agent technologies [18] and other non-structured methods [2]. Authors in [20] proposed a new approach based on optimal power flow technique to minimize customer load shedding aiming to improve load pickup.A software tool to simulate the recovery process of smart grid after an accordance of black out is presented in [21]. In this paper the black-start capability considered as a constant power in the system.…”
Section: Introductionmentioning
confidence: 99%
“…Também existem trabalhos baseados em métodos clássicos de otimização. Em [9] a restauração de sistemas de distribuição é tratada como um problema de Programação Não Linear Inteira Mista (PNLIM), onde as chaves normalmente abertas (NA) são fechadas de acordo com um índice de sensibilidade atribuído. Em [10] a restauração de redes de distribuição também é estruturada como um problema de PNLIM.…”
Section: Introductionunclassified