2018
DOI: 10.12783/dtetr/icmeit2018/23468
|View full text |Cite
|
Sign up to set email alerts
|

A New Networking Technique—The Beeline Diagramming Method

Abstract: The Critical Path Method (CPM) has gradually increased in importance in the construction industry since the Arrow Diagramming Method (ADM) and the Precedence Diagramming Method (PDM) were introduced in 1956 and 1961, respectively. In an improvement over the ADM, the PDM is able to represent overlapping relationships between consecutive activities. It is limited to representing overlapping relationships only as four combinations that connect the starting and finishing points of two consecutive activities, howev… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…In the same year, he introduced the "point-to-point" relationship between the activities at any level of their progression (Hajdu, 2015b), embracing the classic FF, FS, SF, and SS relations. Some similar thoughts can be recognized in the proposal of Kim (2018), who emphasized the inner milestones of related activities when introducing the Beeline method.…”
Section: Introductionmentioning
confidence: 68%
“…In the same year, he introduced the "point-to-point" relationship between the activities at any level of their progression (Hajdu, 2015b), embracing the classic FF, FS, SF, and SS relations. Some similar thoughts can be recognized in the proposal of Kim (2018), who emphasized the inner milestones of related activities when introducing the Beeline method.…”
Section: Introductionmentioning
confidence: 68%