A New Hybrid State Estimation Considering Different Accuracy Levels of PMU and SCADA Measurements

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
17
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
2
1

Relationship

0
7

Authors

Journals

citations
Cited by 47 publications
(23 citation statements)
references
References 35 publications
0
17
0
Order By: Relevance
“…Also, different measurement types and locations introduce time synchronization and time skewness issues because of the different latency of the measurements. In this work, we assume that voltage measurements are synchronized using existing synchronization approaches [64]- [67].…”
Section: ) Standard Ieee 123-node Benchmark Systemmentioning
confidence: 99%
“…Also, different measurement types and locations introduce time synchronization and time skewness issues because of the different latency of the measurements. In this work, we assume that voltage measurements are synchronized using existing synchronization approaches [64]- [67].…”
Section: ) Standard Ieee 123-node Benchmark Systemmentioning
confidence: 99%
“…In Ref. 29 a methodology for improving the condition number for different accuracy levels of measurements is proposed. In Ref.…”
Section: Introductionmentioning
confidence: 99%
“…The refresh rate of PMU measurements is typically 30 times per second, whereas SCADA systems capture one snapshot every 2-6 seconds. Different accuracy level may result in ill-conditioning and convergence problem[42]. Two types of solutions have been proposed in literatures, indirect and direct approaches[42,43].In indirect approaches, the system is assumed to be fully observed by conventional SCADA measurements with which the conventional SE is carried out before the PMU measurements are incorporated.…”
mentioning
confidence: 99%
“…Different accuracy level may result in ill-conditioning and convergence problem[42]. Two types of solutions have been proposed in literatures, indirect and direct approaches[42,43].In indirect approaches, the system is assumed to be fully observed by conventional SCADA measurements with which the conventional SE is carried out before the PMU measurements are incorporated. Zhou et al proposed a linear post-processing step to combine PMU measurements with estimation results of the conventional state estimator[35].…”
mentioning
confidence: 99%
See 1 more Smart Citation