Abstract:The distribution network restoration is one of the most important parts in the total power system restoration process. The distribution network restoration decomposes into the identification of a suitable network configuration, which is defined by the status of switches between the radially arranged power lines and the optimization of the restoration paths, which are schedules for toggling switches and booting network nodes. This paper presents a two-stage approach for the restoration process of radial high vo… Show more
“…This, and other electrical properties such as over-voltage problems caused by self-excitation and energizing unload transmission lines, frequency control during the load restoration, and cold load pick up inrush have to be either validated before starting or checked during the optimization procedure. In our previous work we have already presented handling these requirements in an optimization algorithm [10,9]. Therefore, we will skip this, as the focus of the current work is to find good performing encodings, operators and optimization algorithms for generator start-up sequence optimization.…”
Section: Temporal Nbs Unit Boot Sequence Modelmentioning
confidence: 99%
“…This is the subsequent step after restoring power plants and has been investigated in [2] by reformalizing the process as an combinatorial problem and making it input to a quantum-inspired evolutionary algorithm. In [9] the restoration path selection has been solved by using a multi-objective evolutionary algorithm giving the system operator different solutions that are maximizing the load shedding and minimizing the switching operations. The similarity of restoration path and generator start-up sequence optimization comes not only from the fact that the two tasks are closely interleaved during the restoration process.…”
In the domain of power grid systems, scheduling tasks are widespread. Typically, linear programming (LP) techniques are used to solve these tasks. For cases with high complexity, linear system modeling is often cumbersome. There, other modeling approaches allow for a more compact representation being typically also more accurate as non-linear dependencies can be captured natively.In this work, we focus on the optimization of a power plant start-up sequence, which is part of the network restoration process of a power system after a blackout. Most large power plants cannot start on their own without cranking energy from the outside grid. These are the non-black start (NBS) units. As after a blackout we assume all power plants being shut down, self-contained power plants (black start (BS) units), such as the hydroelectric power plants, start first and boot the NBS units one after each other. Once a NBS unit is restored, it supports the restoration process and because an average NBS unit is much larger than a BS unit, NBS unit's impact on the restoration process is typically dominant. The overall restoration process can take, depending on the size of the blackout region and the damaged components, some hours to weeks. And as the blackout time corresponds directly to economic and life losses, its reduction, even by some minutes, is worthwhile.In this work we compare two popular metaheuristics, the genetic (GA) and simulated annealing (SA) algorithms on start-up sequence optimization and conclude that an efficient restoration plan can be evolved reliably and, depending on the implementation, in a very short period of time allowing for an integration into a real-time transmission system operation tool.
“…This, and other electrical properties such as over-voltage problems caused by self-excitation and energizing unload transmission lines, frequency control during the load restoration, and cold load pick up inrush have to be either validated before starting or checked during the optimization procedure. In our previous work we have already presented handling these requirements in an optimization algorithm [10,9]. Therefore, we will skip this, as the focus of the current work is to find good performing encodings, operators and optimization algorithms for generator start-up sequence optimization.…”
Section: Temporal Nbs Unit Boot Sequence Modelmentioning
confidence: 99%
“…This is the subsequent step after restoring power plants and has been investigated in [2] by reformalizing the process as an combinatorial problem and making it input to a quantum-inspired evolutionary algorithm. In [9] the restoration path selection has been solved by using a multi-objective evolutionary algorithm giving the system operator different solutions that are maximizing the load shedding and minimizing the switching operations. The similarity of restoration path and generator start-up sequence optimization comes not only from the fact that the two tasks are closely interleaved during the restoration process.…”
In the domain of power grid systems, scheduling tasks are widespread. Typically, linear programming (LP) techniques are used to solve these tasks. For cases with high complexity, linear system modeling is often cumbersome. There, other modeling approaches allow for a more compact representation being typically also more accurate as non-linear dependencies can be captured natively.In this work, we focus on the optimization of a power plant start-up sequence, which is part of the network restoration process of a power system after a blackout. Most large power plants cannot start on their own without cranking energy from the outside grid. These are the non-black start (NBS) units. As after a blackout we assume all power plants being shut down, self-contained power plants (black start (BS) units), such as the hydroelectric power plants, start first and boot the NBS units one after each other. Once a NBS unit is restored, it supports the restoration process and because an average NBS unit is much larger than a BS unit, NBS unit's impact on the restoration process is typically dominant. The overall restoration process can take, depending on the size of the blackout region and the damaged components, some hours to weeks. And as the blackout time corresponds directly to economic and life losses, its reduction, even by some minutes, is worthwhile.In this work we compare two popular metaheuristics, the genetic (GA) and simulated annealing (SA) algorithms on start-up sequence optimization and conclude that an efficient restoration plan can be evolved reliably and, depending on the implementation, in a very short period of time allowing for an integration into a real-time transmission system operation tool.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.