2014
DOI: 10.1007/s11269-014-0523-4
|View full text |Cite
|
Sign up to set email alerts
|

A New Application of Flow Duration Curve (FDC) in Designing Run-of-River Power Plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
14
0
1

Year Published

2014
2014
2022
2022

Publication Types

Select...
6
3
1

Relationship

1
9

Authors

Journals

citations
Cited by 40 publications
(15 citation statements)
references
References 23 publications
0
14
0
1
Order By: Relevance
“…For each of these points, the simulated series have been used to construct the flow-duration curve. Flow-duration curves are of interest for many hydrological applications [32] and they are frequently used in the design of run-of-river plants [33]. A flow-duration curve indicates the percentage of time that the river flow is expected to equal or exceed some given values.…”
Section: Flow-duration Curvesmentioning
confidence: 99%
“…For each of these points, the simulated series have been used to construct the flow-duration curve. Flow-duration curves are of interest for many hydrological applications [32] and they are frequently used in the design of run-of-river plants [33]. A flow-duration curve indicates the percentage of time that the river flow is expected to equal or exceed some given values.…”
Section: Flow-duration Curvesmentioning
confidence: 99%
“…To evaluate the behaviour of the Puelo River during the summer of 2016 we generated a flow duration curve with the streamflow data gathered between 1950 and 2016. This approach is commonly used to analyse streamflow series with large data sets 19 , 39 .…”
Section: Methodsmentioning
confidence: 99%
“…This approach has been widely applied to analyze changes in the intra-annual distribution of streamflow in many fields and applications, e.g., in order to identify the best water management practices, in particular in ungauged basins [60], to evaluate flow data quality control [61,62] and to design hydropower plants [63][64][65]. Therefore, a model that evaluates the available water in terms of duration curves was also implemented in the platform.…”
Section: Flow Duration Curvesmentioning
confidence: 99%