2006
DOI: 10.1109/tit.2006.881712
|View full text |Cite
|
Sign up to set email alerts
|

A Necessary and Sufficient Condition for the Construction of 2-to-1 Optical FIFO Multiplexers by a Single Crossbar Switch and Fiber Delay Lines

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
61
0

Year Published

2007
2007
2022
2022

Publication Types

Select...
5
4

Relationship

2
7

Authors

Journals

citations
Cited by 53 publications
(62 citation statements)
references
References 16 publications
1
61
0
Order By: Relevance
“…the constraint that each packet can be routed through at most k of the M fibers by using the packet routing policy in [13].…”
Section: A Class Of Greedy Constructionsmentioning
confidence: 99%
See 1 more Smart Citation
“…the constraint that each packet can be routed through at most k of the M fibers by using the packet routing policy in [13].…”
Section: A Class Of Greedy Constructionsmentioning
confidence: 99%
“…For certain optical queues, including 2-to-1 FIFO multiplexers, linear compressors, and linear decompressors, the delay x of a packet is known upon its arrival and the routing of the packet is according to the C-transform [13] C(x) = (I 1 (x), I 2 (x), . .…”
Section: Introductionmentioning
confidence: 99%
“…We refer the reader to [1], [2], [3], [4], [5], [6], [7] and the references cited therein. A discrete-time queue with a single input and a single output can be viewed as a switch that maps the time sequence of arrivals to the time sequence of departures.…”
Section: Introductionmentioning
confidence: 99%
“…A multiplexer works like a 'hopper', i.e., it always has a departure packet whenever it is nonempty. It has been proved in [14] that an ( + 2) × ( + 2) feedback switch has the capability to emulate a 2-to-1 FIFO multiplexer of size (2 ).…”
Section: Introductionmentioning
confidence: 99%