2018
DOI: 10.1016/j.ifacol.2018.06.095
|View full text |Cite
|
Sign up to set email alerts
|

A Multivariable Controller for the Start-up Procedure of a Solar Membrane Distillation Facility

Abstract: This paper presents a multivariable TITO (two inputs two ouputs) controller aimed to improve the start-up procedure of a Solar Membrane Distillation (SMD) facility, located at Plataforma Solar de Almería (PSA). The control structure includes PID controllers and decouplers, as well as a reference governor based on a real time optimizer. The filtered Smith Predictor (SP) control structure has been used for controlling one of the output variables, whereas a cascade control scheme is employed to control the other … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
12
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
3
2

Relationship

1
4

Authors

Journals

citations
Cited by 7 publications
(13 citation statements)
references
References 16 publications
0
12
0
Order By: Relevance
“…However, the problem related to the stratification of the tank was not considered. A second step towards the improvement of the start-up procedure was presented in Gil et al (2018a) anteeing that the temperature of the fluid flowing to the tank was higher than the one at the top of the tank. On the other hand, the multivariable controller was tasked with tracking the setpoints computed by the reference governor by acting on both pump 1 and valve 1.…”
Section: Control Systemmentioning
confidence: 99%
See 4 more Smart Citations
“…However, the problem related to the stratification of the tank was not considered. A second step towards the improvement of the start-up procedure was presented in Gil et al (2018a) anteeing that the temperature of the fluid flowing to the tank was higher than the one at the top of the tank. On the other hand, the multivariable controller was tasked with tracking the setpoints computed by the reference governor by acting on both pump 1 and valve 1.…”
Section: Control Systemmentioning
confidence: 99%
“…In the present work, the idea for improving the start-up procedure is the same that the one presented in Gil et al (2018a), which consists on using valve 1 as a control variable for heating the tank faster. However, the control structure has been considerably improved by using a hierarchical control system composed of two layers: i) an upper layer based on a predictive controller, and ii) a regulatory layer based on PID controllers.…”
Section: Control Systemmentioning
confidence: 99%
See 3 more Smart Citations