2018
DOI: 10.1016/j.cie.2018.02.035
|View full text |Cite
|
Sign up to set email alerts
|

A multi-skilled worker assignment problem in seru production systems considering the worker heterogeneity

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
44
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 95 publications
(46 citation statements)
references
References 65 publications
0
44
0
Order By: Relevance
“…A robust optimization approach is used to maximize profit. Lian et al studied a multiskilled worker assignment problem in seru production systems. It is considered that there are different skills and proficiency levels for workers.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…A robust optimization approach is used to maximize profit. Lian et al studied a multiskilled worker assignment problem in seru production systems. It is considered that there are different skills and proficiency levels for workers.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Equation (16) states that activity cannot be started before its release time. The completion time of last activity in each project is calculated by Equation (17). Equation (18) preserves that workforce can perform activity only if he/she can do it.…”
Section: Mathematical Modelmentioning
confidence: 99%
“…They also suggested that the worksharing mechanism is suitable for an unbalanced production line. Lian et al [15] proposed an optimization model to improve the inter-cell and inter-worker workload balance ina Japanese cellular manufacturing system. Results show that homogeneous workers perform better, based on the inter-worker workload balance.…”
Section: Workload Balancingmentioning
confidence: 99%
“…Ying and Tsai [13] discussed how to minimize total cost for training and assigning multiskilled workers in seru production systems. Lian et al [14] studied a multiskilled worker assignment problem in seru production systems considering the worker heterogeneity.…”
Section: Literature Reviewmentioning
confidence: 99%
“…where * ( ) = L[ ( )], namely, the Laplace transformation of ( ). Formula (14) has a unique solution in the unit circle; that is, there is 0 < < 1. Therefore, the stationary solution is…”
Section: The Batch Arrival Queuing Model For Seru Productionmentioning
confidence: 99%