2019
DOI: 10.1007/s12351-019-00531-y
|View full text |Cite
|
Sign up to set email alerts
|

A multi-objective reliability-redundancy allocation problem with active redundancy and interval type-2 fuzzy parameters

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
5
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 44 publications
0
5
0
Order By: Relevance
“…Guilani et al [17] introduced a mathematical model for the RRAPs. By maintaining the limits on weight Kundu [18] simultaneously optimized system reliability with system cost of a MORRAP for a series-parallel system.…”
Section: Related Workmentioning
confidence: 99%
“…Guilani et al [17] introduced a mathematical model for the RRAPs. By maintaining the limits on weight Kundu [18] simultaneously optimized system reliability with system cost of a MORRAP for a series-parallel system.…”
Section: Related Workmentioning
confidence: 99%
“…For example, RAPs may be considered with a single objective function, e.g., aiming to maximizing system reliability [1,[3][4][5][6][7][8][9][10][11]27,28,30,31,[35][36][37][39][40][41]44,[46][47][48][53][54][55], minimizing total system cost [12][13][14][15] or maximizing/minimizing other parameters [16,29]. Alternatively, RAPs may consider multi-objective functions [18][19][20][21][22][23][24][25]32,34,38,42,45,50,[56][57][58]…”
Section: Introductionmentioning
confidence: 99%
“…Regarding the components, they might be represented as binary or multi-state. In the binary state representation, the components can only be totally healthy or completely failed [1,[3][4][5][6][7][8][9][10][11][12][13][17][18][19][20][21][22][23][25][26][27][28][29][30][31][32][33][34][35]40,41,[43][44][45][46][47][48]53,55]; in the multi-state, the components might have other states, intermediate between these two [14][15][16]24,[60][61][62][63][64][65]. The type of the components ...…”
Section: Introductionmentioning
confidence: 99%
“…A fuzzy multiobjective reliability‐redundancy allocation problem of a series‐parallel system is proposed by Kundu 9 using interval type‐2 fuzzy numbers to model reliabilities. The goal was to optimize system reliability and cost at the same time, having the constraints on volume, weight, and redundancy level.…”
Section: Introductionmentioning
confidence: 99%
“…The goal was to optimize system reliability and cost at the same time, having the constraints on volume, weight, and redundancy level. Using interval type‐2 fuzzy numbers, Muhuri and Ashraf (2018) 10 also worked on fuzzy multiobjective reliability‐redundancy allocation problem with the same objective functions as Kundu, 9 in which system reliability and cost were optimized simultaneously. In an extension to their previous work, Ashraf et al 11 proposed a variant of particle swarm optimization to solve fuzzy multiobjective reliability‐redundancy allocation problem, while giving users the ability to set the importance weights for each objective.…”
Section: Introductionmentioning
confidence: 99%