“…For example, RAPs may be considered with a single objective function, e.g., aiming to maximizing system reliability [1,[3][4][5][6][7][8][9][10][11]27,28,30,31,[35][36][37][39][40][41]44,[46][47][48][53][54][55], minimizing total system cost [12][13][14][15] or maximizing/minimizing other parameters [16,29]. Alternatively, RAPs may consider multi-objective functions [18][19][20][21][22][23][24][25]32,34,38,42,45,50,[56][57][58]…”