2015
DOI: 10.1007/s12205-015-0615-6
|View full text |Cite
|
Sign up to set email alerts
|

A multi-objective DCP model for bi-level resource-constrained project scheduling problems in grounding grid system project under hybrid uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 37 publications
0
2
0
Order By: Relevance
“…In this article, the project owner seeks to maximize profits whereas the contractor attempts to minimize cost. Finally, PSO was utilized by Zhang to solve the RCPSP with multiple objectives or multiple modes, where the contractor is the Upper Level Decision Maker and the outsourcing partner is the Lower Level Decision Maker (Zhang, 2014;Zhang, Liu, Zhou & Chen, 2015;Zhang & Xu, 2015).…”
Section: Particle Swarm Optimizationmentioning
confidence: 99%
“…In this article, the project owner seeks to maximize profits whereas the contractor attempts to minimize cost. Finally, PSO was utilized by Zhang to solve the RCPSP with multiple objectives or multiple modes, where the contractor is the Upper Level Decision Maker and the outsourcing partner is the Lower Level Decision Maker (Zhang, 2014;Zhang, Liu, Zhou & Chen, 2015;Zhang & Xu, 2015).…”
Section: Particle Swarm Optimizationmentioning
confidence: 99%
“…He firstly proposed the DCP in stochastic environments [12], and then, he gave the theoretical frameworks of DCP in fuzzy environments [11,13], random fuzzy DCP [14], and fuzzy random DCP [9]. In the past few years, DCP has been used to solve many optimization problems, such as the dynamic facility layout problem [15], the bi-level resourceconstrained project scheduling problems [16], and the inventory modeling problems without and with backordering [17].…”
Section: Introductionmentioning
confidence: 99%