2021 IEEE Real-Time Systems Symposium (RTSS) 2021
DOI: 10.1109/rtss52674.2021.00014
|View full text |Cite
|
Sign up to set email alerts
|

A Multi-Level DPM Approach for Real-Time DAG Tasks in Heterogeneous Processors

Abstract: The modeling and analysis of real-time applications focus on the worst-case scenario because of their strict timing requirements. However, many real-time embedded systems include critical applications requiring not only timing constraints but also other system limitations, such as energy consumption.In this paper, we study the energy-aware real-time scheduling of Directed Acyclic Graph (DAG) tasks. We integrate the Dynamic Power Management (DPM) policy to reduce the Worst-Case Energy Consumption (WCEC), which … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 37 publications
0
1
0
Order By: Relevance
“…Many research works have been performed in this area. [17], including the attributes of the tasks such as worst-case execution time (WCET) [7] [9] [17], deadline [7] [9] [10] [11] [12] [13] [14] [15] [16], task period [8] [9] [10] [13] [15], possible priorities [8] [10], or the relations of the tasks specified as a DAG task graph with the communication cost and precedence order of the tasks [6] [7] [9] [10] [11] [12] [14] [15] [16]. The mathematical model of the tasks, together with the machine architecture features, are used to find an optimal strategy for power management.…”
Section: Model-based or Model-free Energy Saving Method?mentioning
confidence: 99%
“…Many research works have been performed in this area. [17], including the attributes of the tasks such as worst-case execution time (WCET) [7] [9] [17], deadline [7] [9] [10] [11] [12] [13] [14] [15] [16], task period [8] [9] [10] [13] [15], possible priorities [8] [10], or the relations of the tasks specified as a DAG task graph with the communication cost and precedence order of the tasks [6] [7] [9] [10] [11] [12] [14] [15] [16]. The mathematical model of the tasks, together with the machine architecture features, are used to find an optimal strategy for power management.…”
Section: Model-based or Model-free Energy Saving Method?mentioning
confidence: 99%