A multi-criteria optimization study for locating industrial warehouses with the integration of BIM and GIS data

Abstract: Achieving a maximum production capacity in large manufacturing factories requires optimal design and implementation of development plans. One of the newest advancements in manufacturing and project management is Building Information Modeling (BIM) which uses creative processes for production, analysis, and management of building information. On the other hand, the output of the Geographic Information System (GIS) model includes one or more actual locations, which satisfy all needs. It provides points related t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 17 publications
(15 citation statements)
references
References 55 publications
0
3
0
Order By: Relevance
“…The architecture, engineering and construction (AEC) industry is not deprived of the use of meta-heuristics. Meta-heuristics have been widely used in the design of structures [65], optimisation of construction site layout [66], material selection [67] and project scheduling [68]. Additionally, several studies have been conducted in the field of occupants' safe evacuation.…”
Section: Application Of Optimization Methods In the Aec Industrymentioning
confidence: 99%
“…The architecture, engineering and construction (AEC) industry is not deprived of the use of meta-heuristics. Meta-heuristics have been widely used in the design of structures [65], optimisation of construction site layout [66], material selection [67] and project scheduling [68]. Additionally, several studies have been conducted in the field of occupants' safe evacuation.…”
Section: Application Of Optimization Methods In the Aec Industrymentioning
confidence: 99%
“…The integration and complementation of each other is the source of the synergy that arises from the use of these technologies together. Examples of positive impacts and combined application of these technologies are numerous in the literature, including [10,[46][47][48], and the potential for their combined use does not yet appear to have been fully utilized. This is mainly due to the problems that are described later in this paper.…”
Section: Fig 2 Time Range Of Data Providing By Bim and Gis Technologi...mentioning
confidence: 99%
“…An example of spatial analysis for optimal location can be an algorithm that analyses the designed object, optimizes the location of tower cranes [48], or optimizes the position of an object under certain conditions [46]. Also, in the operational phase, various types of spatial analysis can be implemented.…”
Section: The Ability To Conduct In-depth Spatial Analyses For the Sub...mentioning
confidence: 99%
“…Kim et al, 2020;Liao et al, 2012;Mischo et al, 2019;Navaratnam et al, 2022;Nekouvaght Tak et al, 2020;Yang et al, 2020;Yoo et al, 2019;Yu et al, 2021;Zhang & Bai, 2015Tummalapudi et al, 2021. The literature highlights the use of BIM to identify materials with reusable potential in deconstruction stages to minimize the costs of future projects and reduce the carbon footprint in the construction industry (Asgari Siahboomy et al, 2021;Basta et al, 2020;Ding et al, 2019).…”
Section: Bim Is Used To Identify Reusable Materials In the Deconstruc...mentioning
confidence: 99%
“…Design Phase: The proposed design phase begins with the BIM-DFE act from the previous phase, and the next sub-process is the incorporation of the finite element analysis of the structure; the BIM estimation model from the previous phase (AbouHamad & Abu-Hamd, 2019;Akanbi et al, 2018;Akanmu & Okoukoni, 2018;Asgari Siahboomy et al, 2021;Bartenbach et al, 2019;Bortolini et al, 2019; H. M. Chen & Huang, 2013; L. K. Chen et al, 2021;Costin et al, 2021;DIng et al, 2018;Ding et al, 2019;Galic et al, 2015;Jeong et al, 2016;K. Kim et al, 2020;Liao et al, 2012;Z.…”
Section: Bim Is Used To Identify Reusable Materials In the Deconstruc...mentioning
confidence: 99%