2019
DOI: 10.1080/03610926.2019.1565836
|View full text |Cite
|
Sign up to set email alerts
|

A mixed double sampling plan based on Cpk

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

1
28
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(29 citation statements)
references
References 29 publications
1
28
0
Order By: Relevance
“…In addition, Prajapati and his colleagues claimed that the construction of the Bayes decision function (as in [8], which is based on the posterior expectation) is quite difficult, when the loss function is a polynomial with a higher degree or if it is not a polynomial. Balamurali et al [6] provided a mixed double sampling plan based on process capability index. The case of acceptance sampling plan under nonparametric distribution has been investigate by [3].…”
Section: Introductionmentioning
confidence: 99%
“…In addition, Prajapati and his colleagues claimed that the construction of the Bayes decision function (as in [8], which is based on the posterior expectation) is quite difficult, when the loss function is a polynomial with a higher degree or if it is not a polynomial. Balamurali et al [6] provided a mixed double sampling plan based on process capability index. The case of acceptance sampling plan under nonparametric distribution has been investigate by [3].…”
Section: Introductionmentioning
confidence: 99%
“…PCIs have strong practical significance for precision manufacturing industry or industry with strict process precision control. 27,28 Among them, the applied studies on PCIs include data sampling, [29][30][31][32][33] data specification and fault tolerance interval, 34 data distribution, 35 measurement error analysis, 36 process parameter estimation, 37 outlier detection, 38 and measurement and potential performance evaluation of process health status. 18 Moreover, based on univariate PCIs, a series of multivariate process capability indices (MPCIs) was developed to evaluate the process stability with multivariate and convert the MPCIs into a univariate index or vector.…”
Section: Introductionmentioning
confidence: 99%
“…(12) suggested "an estimator for estimating population means using a double sampling scheme using two auxiliary variables". Similarly (13,14) , and (15) proposed different estimators for estimating population mean in two-phase sampling. Recently, (16) proposed combination of exponential and ln functions under two-phase sampling using two auxiliary variables for estimating population mean.…”
Section: Introductionmentioning
confidence: 99%