2022
DOI: 10.3390/en15207558
|View full text |Cite
|
Sign up to set email alerts
|

A Mixed Algorithm for Integrated Scheduling Optimization in AS/RS and Hybrid Flowshop

Abstract: The integrated scheduling problem in automated storage and retrieval systems (AS/RS) and the hybrid flowshop is critical for the realization of lean logistics and just-in-time distribution in manufacturing systems. The bi-objective model that minimizes the operation time in AS/RS and the makespan in the hybrid flowshop is established to optimize the problem. A mixed algorithm, named GA-MBO algorithm, is proposed to solve the model, which combines the advantages of the strong global optimization ability of gene… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
references
References 29 publications
0
0
0
Order By: Relevance